Finna Uru Gimibichu Water Dam
about project
Client: Bureau of Irrigation and Pastoralist Development of Oromia Regional State
Contractor: Anwar Seid General Contractor
Consultant: Engineering Corporation of Oromia(ECO)
Project Overview:
The Finna Uru Gimibichu Dam Project stands as a milestone achievement in ASGC’s infrastructure portfolio. This large-scale water infrastructure development was initiated to address the region’s agricultural water demands and enhance climate resilience in Oromia’s pastoralist communities.
Scope of Work:
Anwar Seid General Contractor led the full design and execution of all civil works, including:
- Formation of the dam embankment and core structure
- Construction of water intake and regulated spillway systems
- Installation of control gates and downstream protection works
- Ancillary works supporting future irrigation distribution networks
impact
The dam serves as a critical water retention and regulation system, supporting irrigation for farmland and water supply for livestock throughout dry seasons. By improving water security, the project contributes directly to food production, agricultural stability, and the socioeconomic resilience of thousands of rural households.
The successful completion of this project affirms ASGC’s capability in delivering complex hydro-infrastructure projects with long-term regional impact.


