At Anwar Seid General Contractor, we approached the Wolayta Sodo Airfield project with a comprehensive Design-Build delivery strategy that integrated advanced planning, precision execution, and stakeholder collaboration from day one.
🔹 Integrated Planning & Design Execution
Our team began by conducting detailed topographical assessments and geotechnical investigations of the 3 km x 150 m runway zone. Through a collaborative design process with Ethiopian Airlines Group and regulatory stakeholders, we developed optimized plans that integrated functional airfield geometry with safety and sustainability considerations.
🔹 Turnkey Construction Delivery
The construction scope included:
- Runway, Apron, Taxiway, and Access Road — engineered to international standards for regional aircraft operations.
- Perimeter Security Infrastructure — including fencing and a fully integrated Watch Tower to enhance safety.
- Utility Works — including a comprehensive water supply system to serve both the airfield and adjacent communities.
Using in-house heavy machinery and a skilled construction team, we streamlined logistics, material supply, and phase scheduling to maintain high standards while ensuring timely progress in a geographically remote area.
🔹 Community & Compliance Focus
Our solution not only focused on delivering high-performance airfield infrastructure, but also on creating long-term value through local workforce engagement, environmental compliance, and alignment with aviation safety regulations.
This project exemplifies our capacity to deliver complex, high-value infrastructure under a unified design-build model, reinforcing our reputation as a trusted partner in Ethiopia’s national development.