Asphalt Concrete Road from Floora to Bole High School
about project
Client: Adama City Administration
Contractor: Anwar Seid General Contractor
Project Status: Ongoing
Project Length: 3 km
Project Overview:
This strategic 3 km road project is a key component of Adama’s ongoing urban infrastructure enhancement plan. The road links the Floora neighborhood to the major 40-meter-wide arterial roads and extends to Bole High School, a critical educational institution in the city. Designed to serve both daily commuters and students, the route is essential for improving traffic flow, safety, and accessibility in a fast-growing urban corridor.
Scope of Work:
ASGC is responsible for the full lifecycle of asphalt road construction, which includes:
- Earthwork and subgrade preparation
- Base and sub-base layer construction
- Asphalt surfacing with quality control
- Installation of road markings and signage
- Construction of pedestrian walkways and safety shoulders
- Integration of drainage infrastructure to manage runoff
result
Once completed, the project will ease congestion, enhance access to schools and residential areas, and facilitate safer, more efficient transportation within Adama. It reflects ASGC’s commitment to building sustainable and community-focused infrastructure that meets the needs of both present and future urban mobility.
what our customers say?