End of Get Eshet – Ekos Factory via Abo Church & Teltel Gorge
about project
Client: Bishoftu City Administration
Contractor: Anwar Seid General Contractor
Project Status: Completed
Length: 2.3 km
Project Overview:
This infrastructure development project connected key residential, religious, and industrial zones within Bishoftu by constructing a 2.3 km road through challenging topography. The route links the Get Eshet area to Ekos Factory, Abo Church, and Teltel Gorge, serving as a vital access corridor for freight vehicles, worshippers, and local communities.
Scope of Work:
ASGC delivered a two-phase road solution, beginning with gravel surfacing followed by final asphalt pavement. Major components of the project included:
- Roadway excavation and stabilization across hilly terrain
- Gravel base layer construction
- Asphalt surfacing for high-traffic sections
- Installation of robust drainage structures to withstand seasonal flooding
- Finishing works including road shoulders and safety features
Imapct
This road now ensures year-round accessibility for industrial logistics, religious gatherings, and residential mobility. It has played a pivotal role in reducing travel time, improving trade and transport, and supporting Bishoftu’s urban expansion efforts. The successful delivery of this technically demanding project further solidifies ASGC’s reputation for executing complex terrain works with precision and durability.